What a commercial electrical fit-out actually involves

A commercial electrical fit-out is everything between an empty tenancy and a space that can legally open: a supply and switchboard check, a layout that matches how the business will use the room, lighting and emergency lighting, power and data, testing, and the Certificate of Compliance that the occupancy sign-off depends on. Most of the cost is decided in the first 2 stages, before anyone picks up a drill.

SA Electrical Contractor Licence PGE355384 · NECA member · $20 million public liability · Mon to Fri, 6am to 6pm

Free quote, written scope

Ask us about your site

Free quote · No obligation · Mon to Fri, 6am to 6pm

10 electricians

20 years in business

40+ years experience

Commercial, industrial, residential

Licence PGE355384

NECA member · $20 million PL

5.0 on Google

7 verified reviews

Stage 1: is there enough supply?

Before a single cable is run, the existing supply and switchboard get checked against what the new business will draw. A cafe replacing an office might need 3-phase for the kitchen. A gym replacing a retail shop might need double the lighting and air conditioning load. Finding this out on day 1 is a phone call to SA Power Networks and a look inside the board. Finding it out at the end means a new main switchboard nobody budgeted for.

Stage 2: the layout

The layout is where the tenant's plan meets the electrician's. Where the counter goes decides where the point-of-sale power and data go. Where the desks go decides the floor boxes. Where the fridges go decides the dedicated circuits. We walk it with the tenant and the builder and mark it on the plan, because moving a power point on paper costs nothing and moving it after the plasterboard is on costs a few hundred dollars each time.

Stage 3: rough-in

Rough-in is the cabling that goes in while the walls and ceilings are open: circuits back to the board, lighting runs, data cabling, containment for anything that has to be accessible later. On a commercial fit-out this is the stage that has to be coordinated with the plumber, the mechanical contractor and the plasterer, and it's the stage where a crew of 3 or 4 finishes in days what 1 electrician would take weeks over.

Kris Electrical Services electrician kneeling at new white joinery fitting off power outlets on a commercial fit-out
Fitting off power into new joinery on a commercial fit-out.

Stage 4: lighting and emergency lighting

General lighting is usually LED panels or track on a switching plan that matches how the space is used. Emergency lighting and illuminated exit signs are separate: the National Construction Code requires them in most commercial buildings, they're installed to AS/NZS 2293.1, and they get a 6-monthly discharge test for the life of the tenancy. Certifiers check them at handover.

Stage 5: fit-off

Fit-off is the visible work after the walls are finished: power points, switches, light fittings, data outlets, the kitchen equipment connections and the switchboard labelling. It's also where the commercial lighting is aimed and the switching is tidied so the staff aren't hunting for the right switch on opening day.

Stage 6: testing

Every circuit is tested before it's energised: insulation resistance, earth continuity, polarity, RCD trip times. The results go on the test record and the switchboard schedule. If the tenancy has patient areas, server rooms or anything else with its own standard, that testing happens here too.

Stage 7: the Certificate of Compliance

In South Australia the electrical contractor must issue a Certificate of Compliance for the installation work, and the building certifier will want to see it before the occupancy sign-off. It's the document that says the work was done by a licensed contractor to the Wiring Rules. If a fit-out quote is unusually cheap, one of the questions to ask is who's putting their licence number on that certificate.

Where fit-outs go wrong

  • Supply discovered late. The single most expensive surprise. Check it first.
  • Layout changed after rough-in. Every moved outlet is rework. Freeze the plan before the plasterer.
  • Emergency lighting forgotten. It's not a light fitting, it's a certified life-safety system with its own test regime.
  • No test records. Without them the certifier and the insurer both have questions.
  • 1 electrician on a 10-day programme. Fit-outs run to a builder's schedule. The crew has to be sized to it.

If you're planning a fit-out, the most useful thing we can do is look at the tenancy before the lease is signed. It takes an hour and it's free.

Need this done rather than read about? See commercial electrician or request a free quote.

FAQs

Questions we get on this

How long does a commercial electrical fit-out take?

A small retail or office tenancy is typically 1 to 2 weeks of electrical work spread across the builder's programme. A cafe or medical tenancy with 3-phase equipment and specialist areas is 3 to 6 weeks. The programme is set by the builder; we size the crew to it.

Do I need a new switchboard for a fit-out?

Only if the existing board can't carry the new load or has no spare ways. We check that first, because it changes the budget more than anything else in the job. See our switchboard upgrade cost guide for what a new board typically costs.

Who provides the Certificate of Compliance?

The licensed electrical contractor who did the work. In South Australia that's a legal requirement, and the building certifier will ask for it. Keep a copy with the lease documents.